Brief Description: Removed rivets from leading edge of port wing.
1. Drilled leading edge rivet heads with #30 drill, in alternate holes. 2. Punched out rivet bodies. 3. Clecoed alternate holes 4. Repeated steps 1-3 for alternate holes. 5. Peeled back leading edge. 6. Disconnected fuel tank, and removed from wing.