KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  12-7-2009
Number of Hours:  2.30
Manual Reference:  (none)
Brief Description:  Installed battery box

1. Fabricated side supports.
2. Deburred stiffner and side supports.
3. Primed mating surfaces of battery box stiffner and side supports with zinc chromate primer.
4. Clecoed stiffner in place and riveted with A4 rivets.
5. Clecoed side supports in place and clecoed with A4 rivets.
6. Drilled pass-through hole for battery box drain.
7. Deburred hole & zinc chromated.
8. Positioned battery box, and bolted in place with appropriate length AN3 bolts, washers, and lock nuts.

Note: AN3 bolt length determined by test fit.
' style=

Battery box stiffner clecoed in place

Battery box stiffner clecoed in place

' style=

Stiffner and side supports riveted in place

Stiffner and side supports riveted in place

' style=

Battery box bolted in place

Battery box bolted in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.