1.Drilled holes for 5/16 grommet on stbd upper instrument panel. 2. Deburred and installed grommet. 3.Temporarily taped led array along top of panel. 4.Determined length of wire to TB3. 5.Stipped wires and lugged. Soldered to insure good connectivity. 6.Connected black wire to TB3-4 (ground) and red wire to TB3-8 (instrument lights). 7.Repeated steps 1-6 for port side.