KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  9-17-2009
Number of Hours:  1.50
Manual Reference:  6B12
Brief Description:  Added stiffners to bulkhead 6B12-2.

1. Located bulkhead 6B12-2.
2. Cut "L" bracket stiffners per dwg 6B12.
3. Deburred "L" brackets after fit check.
4. Drew rivet line on "L" brackets.
5. Back drilled with #40 bit and clecoed.
6. Opened holes with #30 bit for A4 rivets.
7. Removed "L" brackets
8. Primed mating surfaces of "L" brackets and bulkhead with zinc chromate primer.
9. Allowed to cure.
10. Clecoed brackets to bulkhead.
11. Riveted with A4 rivets.
' style=

stiffners clecoed in place

stiffners clecoed in place

' style=

parts primed prior to assembly

parts primed prior to assembly

' style=

assembled and riveted

assembled and riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.