KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  11-13-2012
Number of Hours:  10.50
Manual Reference:  
Brief Description:  Reinstalled canopy frame

1. Repaired damage to canopy frame.
2. Cut new closeout pieces, using old as templates.
3. Primed and painted.
4. Installed frame on aircraft.
5. Positioned closeouts.


Need to paint areas on aircraft scratched during repairs, and install side pieces after canopy installation.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.