1) Drilled access holes on either end of front canopy frame for flexible cable housing. 2) Used drill bit to form opening in direction of cable path. 3) Deburred. 4) Fed flexible cable housing through front canopy frame. 5) Termnated cable housing on stbd side with 25-0700 cable stop. 6) Fed cable through cable housing. 7) Ran stbd cable through fittings on external locking handle. 8) Fitted stbd end of cable with nicopress sleeve, and pressed in place. 9) Terminated stbd end of cable housing with 25-0700 cable stop.