Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
Fuselage
4-28-2010
< Previous Log Entry
Next Log Entry >
Date:
4-28-2010
Number of Hours:
0.80
Manual Reference:
6B21
Brief Description:
Clecoed tube frames in place
1. Clecoed front tube frame 6B21-2 to gussets 6B21-8.
2. Clecoed gussets to fuselage.
3. Clecoed rear tube freame assembly 6B21-1 to fuselage.
4. Riveted gussets 6B21-8 to fuselage.
5. Riveted front tube frame to gusset.
6. Riveted rear tube frame assembly to fuselage.
Adding rear tube frame
Riveting rear tube frame in place
removign clecos
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
Elevator
22
44
elevator
12
23
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
Prop
2
3
prop
2
4
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.