KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-23-2009
Number of Hours:  2.10
Manual Reference:  6T2
Brief Description:  Rework elevator attachment to fuselage

When an attempt was made to temporarily install the elevator, so the rear skin could be cut to match, an error was discovered. Part 6T2-3 had been incorrectly fabricated, and riveted to the elevator assembly.

1. Drill out rivets holding 6B2-3 in place, and remove the old part, along with shim 6HD.
2. Order the material used to fabricate 6B2-3.
3. On receipt, cut necessary material from 6B2-3.
4. Using 6HD as a template, backdrill the mounting holes in 6T2-3.
5. Deburr, clean up, and prime with zinc chromate primer.
6. Open elevator skin, and remove head of drill-out rivets.
7. Re-seal skin.
8. Install 6T2-3 and 6HD with cleoes, and rivet with A5 rivets.
' style=

The new part

The new part

' style=

Clecoed in place

Clecoed in place

' style=

The removed part. Note differences.

The removed part. Note differences.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.