KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  6-26-2014
Number of Hours:  1.10
Manual Reference:  test plan 3.4
Brief Description:  Second engine run

1. Added critical safety wire.
2. Prepared are per test plan.
3. Set up camera to record event.
4. Entered & secdured aircraft, started engine.
5. Most things look pretty good, but:
A. May need a new "B" fuel pump - won't create or hold pressure.
B. Fuel pumps cycle pressure - drops, then rise again. May be normal.
C. Oil temp slow to come u. This may be due to oil temperature sensor location, and may not really be a problem.
D. One CDI light evidently needs replacing.

Ready for general cleanup.
' style=

Entering the test aircraft

Entering the test aircraft

' style=

Closing the canopy

Closing the canopy

' style=

Engine Running

Engine Running

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.