KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  4-9-2012
Number of Hours:  2.90
Manual Reference:  (none)
Brief Description:  Installed Carby fittings & heat control

The carby controls need a hard point to insure the cable doesn't slide around when activated. I fabricated an arm that affixes to the oil tank.

1) Cut attachment plate from aluminum..
2) Cut copper arm from scrap.
3) Bent to fit, clkeaned up, primed, painted.
4) Connected to Engine with oil tank bolt.

All three of the carby controls (Mixture, heat, throttle) needed a specialized fitting to accept the wire from the cockpit controls. In the process of installing the fittings, I broke the mixture control, and had to order another.

1) Adel clamped the heat control to the carby heat box, using the hard point provided.
2) Cut cable to length.
3) Ran control wire through fitting, and tightened in place.
' style=

Building the hard point arm for the controls.

Building the hard point arm for the controls.

' style=

Fastening the heat cable to the hard point

Fastening the heat cable to the hard point

' style=

Cutting the heat control cable to length.

Cutting the heat control cable to length.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.