Brief Description: Replace carby manifold hw, routed mixture control
1. Removed existing nuts, holding manifold to engine, one at a time. 2. Replaced with castelated nuts. 3. Torqued per limits table. 4. Installed cotter pins. 5. Routed carby heat control cable through engine mount. 6. Installed two adel clamps to fix to engine mount. 7. Installed one adel clamp to hold to air box.
Did not connect control cable to air box at this time, nor cut cable to length.