KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  9-27-2010
Number of Hours:  2.30
Manual Reference:  (none)
Brief Description:  Secured brake lines

The brake line was previously routed along the front of the gear, and under the fuselage. There really isn't a good location for the line; just some that are less objectionable than others.

1. Located positions for adel clamps on port and stbd gear.
2. Marked holes for screw attach.
3. Drilled 5/8" deep with #40 bit.
4. Opened holes with #34 bit.
5. Tapped holes for 6-32 screws.
6. Installed dg4 adel clamps to brake line with ms series #6 1/2" screws.
7. Located adel clamps on port and stbd under fuselage.
8. Drilled with #30 bit, and clecoed.
9. Located adel clamps inside fuselage, drilled with #30 bit, and riveted with A4 rivets.

Note: Under fuselage and gear clamps will be removed for painting, then replaced and riveted or affixed with screws, as appropriate.
' style=

Stbd line attached to gear with DG4 adel clamps

Stbd line attached to gear with DG4 adel clamps

' style=

Line fastened to fuselage with DG4 adel clamps

Line fastened to fuselage with DG4 adel clamps

' style=

Interior line installation

Interior line installation

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.