KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  11-9-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fit main panel to sub-panel

I only have 3 days before I have to go back for another 8 days of work but I did some fitting today. I still forgot I had to drill the holes for the #8 screws that hold the main panel to the panel frame. When I had to have the panel redone, I sent them a new blank and the holes were not opened up to #19 for #8 screws. After that was done I test fit the panel and realized that the D10A flush mount interferes with the panel frame. I made a notch to take care of this and everything fit fine. I spent the rest of the day finalizing the switch labels. I may get to that before I go back to work.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.