Today I made little clips to hold the static line along the top longeron. I primed them and while they dried I prepared the two NACA vents to be attached with proseal. This amounted to roughing the skin and vents. I will have to open my tube of proseal tomorrow to rivet on the exhaust cooling ramp and I want to attach these vents as well. After the clips dried I test fit them by attaching the clips with clecoes. The clips will get riveted in place with the top skin.