I moved on to finishing up the tail wire organization. The wires that run down the F808 bulkhead split in this area. The antenna cable runs to the ELT and the other wires run into the conduit. I drilled for a cable clamp to anchor the wires as they go into the conduit. For the antenna cable I used an aluminum clip that I found at home depot to anchor the cable to the side of the ELT bracket. I added some vinyl tube to protect the cable insulation, and then used a zip tie for added security. I then temporarily zip tied the wire bundle. This looks like it will be nice and secure so now I have to tie everything up with lace string and cut off the zip ties.