KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  12-30-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Pulled wires for Alt Field and IGN

Not much building mojo today, I twisted my back so I could not work hunched over the fuselage for very long. I did manage to replace the cushion clamps on the bundle that runs under the right console. I had originally used a WDG 8 but had to go up to a WDG 9 due to the size of the wire bundle. Since I hope to start hooking up the wires to the circuit breakers I want over them all and realized I still needed to pull the wires for the ignitions and the alternator field CBs, so I pulled the wires that go from the CBs to the switches on the right subpanel, I will pull the wires to the engine area once I get the engine in place.

After pulling these wires I splice the wires for the front side LED lights and labeled them. One more day of building for the year, hopefully my back will be better in the morning.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.