Powered By Kitlog Pro v2.0
Brians RV-10 Construction
RV-10
Empennage
3-11-2005
< Previous Log Entry
Next Log Entry >
Date:
3-11-2005
Number of Hours:
3.00
Manual Reference:
Brief Description:
Tailcone construction
Assembled and match drilled the tie down bar and fuselage bulkhead section.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
All
A/C Hardware & Supplies
Avionics
Empennage
Engine
Firewall Forward
Flight
Fuselage
Hardware
Insturment Panel
Interior
Miscellaneous
None
Paperwork
Prop
Systems
Tools
Training
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.