KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  12-18-2005
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Metal Prep and Priming

Finished prepping the brake pedals and hung them up for priming. Also put a final coat of primer on some of the other fuselage panels and interior. I do have the interior at a point that it can now have the finish coat, but since its cold outside (in the 20's) and I'll need a fresh air mask I’ll have to postpone this step. It will cause me additional work, but at least the project will not be stalled.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.