KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  11-1-2005
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Baggage Aread

Finished installing the last of the baggage area nutplates. Received my hardware order from Van's, so I finished Installing the battery tray and solenoid. Installed the LP4-3's on the baggaga aread side panel. Ran the pull strings in the conduit.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.