KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  2-25-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  NOSE WHEEL FAIRING

Reworked the nose wheel fairing as the initial install didn't provide the clearance from the ground or the fit with the leg fairing I wanted. This time I was careful to use the right dimension with the correct tire pressure. Applied the epoxy to the inside of the fairing and will let it set for a day or two.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.