Powered By Kitlog Pro v2.0
Brians RV-10 Construction
RV-10
All
10-23-2005
< Previous Log Entry
Next Log Entry >
Date:
10-23-2005
Number of Hours:
8.00
Manual Reference:
Brief Description:
Baggage area floors riveted and primed
Riveted in the rear baggage floors, cleaned, and primed. While the paint was drying I decided to attach the elevators and install the rear push tube.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
248
1223
A/C Hardware & Supplies
2
2
Avionics
14
78
Empennage
73
334
Engine
11
32
Firewall Forward
11
82
Flight
3
2
Fuselage
95
450
Hardware
2
12
Insturment Panel
4
29
Interior
1
4
Miscellaneous
1
8
None
4
34
Paperwork
1
2
Prop
4
13
Systems
1
8
Tools
1
1
Training
1
10
Wings
19
122
Copyright © 2001-2024 Matronics. All Rights Reserved.