KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  11-17-2007
Number of Hours:  8.00
Manual Reference:  
Brief Description:  INSTALLED AND WIRED SWITCHES

Installed and wired the toggle switches to various systems: strobes, nav lights, landing lights, fuel pump, flap positioning system, pitot heat
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.