Powered By Kitlog Pro v2.0
Brians RV-10 Construction
RV-10
All
9-30-2006
< Previous Log Entry
Next Log Entry >
Date:
9-30-2006
Number of Hours:
8.00
Manual Reference:
Brief Description:
Cowling Work
Tackled the cowling once again and this time made significant progress. Both top and bottom cowl now fitted in place with only the upper side hinges remaining to be drilled and riveted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
248
1223
A/C Hardware & Supplies
2
2
Avionics
14
78
Empennage
73
334
Engine
11
32
Firewall Forward
11
82
Flight
3
2
Fuselage
95
450
Hardware
2
12
Insturment Panel
4
29
Interior
1
4
Miscellaneous
1
8
None
4
34
Paperwork
1
2
Prop
4
13
Systems
1
8
Tools
1
1
Training
1
10
Wings
19
122
Copyright © 2001-2024 Matronics. All Rights Reserved.