KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  8-22-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Engine Baffling

I don't really have a good picture to post of the engine baffling yet....it's still too much in a state of on-and-off-the-engine-again so I will likely post a good pic showing the final product.In the mean time here is a pic of me working on it - this is the left front (#2?) cylinder baffle being riveted!
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.