KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  4-30-2006
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Forward Fuselage

Worked on wrapping up the cowl attach hinges and forward fuselage cover. In this picture you can see the Koolmat I have installed to eliminate the center console overheating that seems to be problematic in the -10's. Here is the link for the Koolmat product: http://www.koolmat.com/aircraft.shtml . The barrier is held primarily by Sticky Stuff spray adhesive. The heater valves and oil cooler housing also hold the material closely to the firewall. Also ran the control cables through firewall snap bushings. This week I'll countersink & dimple the hinges & shims (respectively) and final rivet the whole section into place.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.