KitLog pro

Powered By Kitlog Pro v2.0

Robin's RV8 Web Site
' style=
Date:  5-10-2013
Number of Hours:  1.00
Manual Reference:  9-2
Brief Description:  Canopy Sikaflex Prep.

The Frame was masked in a similar way to the canopy. All the kit was laid out and prepared for a stressed out Sikaflex session. It was an anticlimax.
Sikaflex cleaner 205 was used first, Sikaflex 206 primer was used on the Frame and 209 D (note the ā€˜Dā€™ ) primer on the plexiglass. All chemicals were secured from Mailspeed Marine; their technical guys were most helpful.
The aim is not to have a canopy depart in flight and be embarrassed.
' style=

Frame Masking

Frame Masking

' style=

205, 209 & 206

205, 209 & 206

' style=

Equip laid out

Equip laid out

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.