Started work on engine control brackets, both aft and forward, which will mount and guide the throttle, mixture, cabin heat, and alternate air controls and cables. Measured and drilled holes per Dwg. 25A, riveted nutplates, and sprayed aft (cabin) control with acid-etch primer.