Date:  5-17-2019
Number of Hours:  40.00
Manual Reference:  
Brief Description:  Engine start

Catch up since last entry.
Airframe electrical is going in. Panel is mostly wired. Grand Rapids EIS is wired and all probes appear to be operational. Copied the breadboard from the test stand to the finished install.
Mags, ebus, and starter circuits are in place. Ebus main feed and alternate feed are in place.

Fuel system is only getting 20PSI. Expect 43. Working on that today.

Throttle cable installed on engine and temporarily mounted at forward seat until final position can be settled.

Got first engine start on the airframe last evening.

Still need to finish wiring the VHF, ADS-B, fuel flow, fuel gauge, and G-meter/timer.