KitLog pro

Powered By Kitlog Pro v2.0

Phills Web Site
' style=
Date:  5-5-2019
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Panel and electrical

Weary.
2 solid days on the electrical system. Wiring schema is worked out, Nucholls, e-bus to support the fuel injection with everything else off. 2 batteries: the fuel injection pump draws 6 amps. Trick will be to feed e-bus direct from batteries when main contactor is off. Wanted a way to charge the batteries from shore power wtihout making the entire ship hot.Think all those details are worked out. Standard left-to-right switch sequence is set.
Where to put the hot bus, the e-bus, the panel bus, and the main ground bus? Where can the iPad go that won't be completely in the way? Panel is full. 4th iteration has the panel settling down, switches located well. Still need another re-do on the panel to fix a couple layout issues not happy with. Running out of space for gauges, e,g, fuel pressure, fuel flow, clock/timer/g-meter. Fuel gauge placement ok.
Looks like batteries are going under rear seat.

This is taking too long. Need more forward progress.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.