Retrieved the alternator from the ceiling storage Checked all parts were present and installed the alternator. There are a few tricks to what order you install things, I made all the mistakes, but it's now installed. I'm going to alodine the tension bar, so that will go on tomorrow. ( why is this build taking so long? ) I drilled two 2mm holes in the tension bar, ( one each end ) for safety wiring of the bolts.