Sling4
Undercarriage
Work Logs Found:
29
Category Work Time:
77 Hours
Date
Hours
Work Log Summary
Details
04-06-2024
2.00
Wheel Spats.
Details
04-05-2024
4.00
Wheel Spats.
Details
04-05-2024
1.00
Wheel Spats.
Details
04-04-2024
4.00
Wheel Spats.
Details
01-17-2024
2.00
Wheel Spats.
Details
11-14-2023
2.00
Brake Heat Shield.
Details
11-13-2023
3.00
Brake Heat Shield.
Details
11-12-2023
2.00
Axle Spacers.
Details
11-12-2023
1.00
Axle Spacers.
Details
05-25-2022
2.00
Brake Bleeding.
Details
05-25-2022
1.00
Brake Bleeding.
Details
10-12-2021
2.00
Brake Lines.
Details
10-12-2021
2.00
Brake Lines.
Details
10-11-2021
3.00
Brake Lines.
Details
10-11-2021
3.00
Brake Lines
Details
08-03-2021
2.00
Brake Lines.
Details
07-02-2021
2.00
Brake Lines.
Details
06-30-2021
2.00
Brake Lines.
Details
06-25-2021
3.00
Brake Lines.
Details
06-24-2021
6.00
Wheels and Brakes.
Details
09-26-2020
3.00
Fuel Selector.
Details
09-25-2020
2.00
Fuel Lines.
Details
09-25-2020
3.00
Fuel Lines.
Details
06-16-2020
4.00
Fuel System.
Details
05-27-2020
1.00
Fuel Pumps.
Details
05-20-2020
6.00
Fuel Pumps.
Details
05-19-2020
5.00
Fuel Pumps.
Details
04-09-2020
2.00
Fuel Hoses.
Details
02-25-2020
2.00
Fuel Pumps.
Details
SITE NAVIGATION
Contact Builder
Sling4 Home
Category
# Logs
# Hours
All
1298
2991
Avionics
141
352
Canopy
16
51
Electrical
37
117
Electrical
37
83
Empennage
21
40
Engine
189
475
Firewall
37
83
Flight Controls
28
68
Flight Controls.
40
87
Front Windscreen
37
86
Fuel System
14
49
Fuel System
29
77
Fuel Tanks
29
77
Fuselage
194
442
Miscellaneous
88
72
None
28
68
Painting
49
87
Prop
2
2
Propeller
2
2
Propeller
49
87
Tools
7
10
Undercarriage
40
87
Undercarriage
29
77
Upholstery
28
68
Upholstery
37
86
Windscreen
16
51
Wings
74
207
Copyright © 2001-2024 Matronics. All Rights Reserved.