Work Logs Found:
19
Category Work Time:
31 Hours
Date
Hours
Work Log Summary
Details
03-04-2022
1.00
Vertical Stab. Fairing.
Details
02-02-2022
4.00
Rear Stabilizer Fairing.
Details
01-29-2022
2.00
Vertical Stabilizer Fairing.
Details
01-29-2022
2.00
Vertical Stabilizer Fairing.
Details
05-10-2020
2.00
Vertical Stab. Fairing.
Details
05-10-2020
2.00
Vertical Stab. Fairing.
Details
05-08-2020
2.00
Control Cable Cover.
Details
05-03-2020
2.00
Empennage.
Details
05-03-2020
2.00
Empennage.
Details
04-25-2020
2.00
Empennage.
Details
04-25-2020
2.00
Empennage.
Details
02-03-2019
1.00
Rudder.
Details
02-03-2019
1.00
Rudder.
Details
01-20-2019
1.00
Empennage
Details
01-20-2019
1.00
Empennage
Details
01-20-2019
1.00
Empennage
Details
05-10-2018
1.00
Empennage Control Cover.
Details
05-09-2018
1.00
Empennage Control Cover.
Details
05-09-2018
1.00
Empennage Control Cover
Details
SITE NAVIGATION
Contact Builder
Sling4 Home
Category
# Logs
# Hours
All
1182
2655
Avionics
141
342
Canopy
18
55
Electrical
37
117
Electrical
44
100
Empennage
19
31
Engine
143
355
Firewall
44
100
Flight Controls
29
68
Flight Controls.
37
80
Fuel System
20
56
Fuel System
11
27
Fuel Tanks
20
56
Fuselage
289
663
Miscellaneous
89
75
None
29
68
Painting
45
80
Propeller
1
1
Tools
6
8
Undercarriage
37
80
Undercarriage
20
56
Upholstery
37
86
Upholstery
29
68
Wings
37
83
Copyright © 2001-2023 Matronics. All Rights Reserved.