The two JAC's visited yesterday, so I took the opportunity to move the left wing from the storage shed to the build shed. It was much easier with four of us moving the wing as it had to be lifted off the stand and carried to the build shed. I installed the flap torque tube retaining ring and ran a wire from the fuel quantity sender.