KSC gave me a hand to spray paint the inside of the elevator skin. I bolted the elevator to the horizontal Stab. and then clamped both ends to ensure the elevator is perfectly aligned. JAC gave me a hand to rivet the elevator skin, two sets of hands and three legs makes the job much easier Top side is done, working on the underside which I will finish tomorrow.