Powered By Kitlog Pro v2.0
Russells RV10 Project
RV-10
Empennage
2-15-2010
< Previous Log Entry
Next Log Entry >
Date:
2-15-2010
Number of Hours:
6.00
Manual Reference:
9.1-
Brief Description:
Elevator left assembly
After messing up a stringer on the fuse I switched back to doing the elevators. Assembled the ribs, bent the close-out tabs, and assembled the tip. I decided to build them one at a time starting with the left one.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
RV-10 Home
Category
# Logs
# Hours
All
174
692
Air Conditioning
6
23
Avionics
9
27
Empennage
40
136
Engine
7
51
Fuselage
77
352
Miscellaneous
3
6
Oxygen
3
8
Prop
1
1
Shop Supplies
1
3
Tailcone
17
47
Wings
10
38
Copyright © 2001-2024 Matronics. All Rights Reserved.