Brief Description: Finished drilling front fuse side to bottom and f
I finished forming both the left and right lower front sides of the fuselage to the curve of the fuse bottom. I had a bit of a bump near the main spar box, but 1) it will be hidden by the wing and 2) Sean feels once the excess is trimmed a little fiddling will make it go away.
The firewall was drilled to the sides as well up to the upper longeron where the no drill zone was respected as per the plans.
The sides where re-enforced via a gusset between the heel support channel and the vertical L angle on the side.