KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  3-6-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Re-assembled front of fuse and worked on spar box

Re-assembled the lower front fuse today after deburring and priming. I installed permanently the rudder pedal mounting points. I also riveted the brake pedals onto the newly powder coated rudder pedals..

I continued work on the spar box alignment jig. I cut out two sets of 3 alignment templates as spelled out in the plans. I made 2 of each so that I could be sure both sides are aligned correctly.
' style=

Fuse front reassembled after priming

Fuse front reassembled after priming

' style=

Spar box jig components

Spar box jig components

' style=

Rudder pedals back from powder coating and riveted

Rudder pedals back from powder coating and riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.