KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  3-26-2008
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Rivted front bottom fuse and installed rudder peda

Back at it after the March break with the kids.

I riveted the front bottom of the fuse in preperation to moving it off the table and onto steel bars and saw horses. I bought 2 pcs of 2 x 2 steel tubing that is 12 ft long for the next step.

The rudder pedals and the brake master cylinders were installed. Some minor trimming was required to allow the brakes to swing without binding. In addition, I had to sand the powder coat out of a few places where the tape came off to allow for bind free operation.
' style=

Spar box riveted in place

Spar box riveted in place

' style=

Bottom front of fuse riveted

Bottom front of fuse riveted

' style=

Rudder pedals in place

Rudder pedals in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.