Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
polishing
6-19-2011
< Previous Log Entry
Next Log Entry >
Date:
6-19-2011
Number of Hours:
5.70
Manual Reference:
Brief Description:
polishing fuselage #8
Today was cyclo day with F7 polish (x2).
-fuselage
-empennage
-flaps
-one aileron
I have the other aileron and the elevators and the wing root fairings to go and then I can switch to S polish and do it all over again for 6 hrs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
All
About me
Avionics
BENCHMARKS
Elevators
Empennage
Engine
Finishing
Firewall Forward
Fuselage
Hints and Tips
Horizontal Stab
Inspiration
Instrument Panel
Miscellaneous
Paint
polishing
post construction mx
PROGRESS CHARTS
Rudder
Shop
Shop Supplies
Tools
Vertical Stabilizer
What is an RV8
Wings
Wiring
Copyright © 2001-2013 Matronics. All Rights Reserved.