KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  12-16-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage wiring runs #2

Spent the bulk of the time figuring out where to run the battery cable for my rear mounted battery. I tired to keep it separate from the other runs and use conduit since it'll be high amperage during starts. I also didn't want it near the fuel valve and pump/filter assembly so I sent it up the right hand side. I drilled a hole in the bulkhead aft of the rear spar (the rear spar and spar already have holes). I started running the conduit through the right gear tower and into the spar (after rooming the grommets that were already in the spar).
' style=

The battery cable conduit going through the spar center section

The battery cable conduit going through the spar center section

' style=

Conduit going through the right gear tower

Conduit going through the right gear tower

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.