KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  10-18-2009
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Flight Controls - install #1

Today was the most I have gotten done in weeks. Most of this stuff has been installed before but had to be removed to facilitate other parts of the build.
-Reinstalled the torque tube that runs from the controls to the elevator idler. (torqued and marked)
-Installed the idler (torqued and marked)
-Installed the long torque tube that runs from the idle to the elevator horn (torqued and locked)
-Installed the front contol stick onto the inner torque tube that runs through the control column so I can re-determine the proper length of this tube so both sitick are vertical with the elevator in the neutral position.
' style=

Elevator idler all hooked up and ready to go - permenantly.

Elevator idler all hooked up and ready to go - permenantly.

' style=

Control column going  back together.

Control column going back together.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.