KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  9-23-2009
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Brake lines #3

Continued to work on sorting out the brake and fuel vent lines that transverse the gear towers. I have the basic shapes worked out and I have the fittings flaired on the right tower along with the plastic sleeve for the brake line installed. I haven't put them in for the final time or trimmed off the vent on the outside bottom of the fuselage.
Good progress.
' style=

Here's the right brake line with plastic sleeve and ends installed.

Here's the right brake line with plastic sleeve and ends installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.