KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  8-7-2009
Number of Hours:  2.30
Manual Reference:  10-2
Brief Description:  Landing Gear Install #2

-Started putting the wheel and tire assemblies together and realized Mitch is home and can help me bolt up the gear legs.
-Bolted up the gear legs (left/right)
At this point I haven't looked at the alignment although it should still be set from my previous efforts when the holes were drilled originally.
' style=

One of the main wheels

One of the main wheels

' style=

Mitch and I bolting up the right leg.

Mitch and I bolting up the right leg.

' style=

Both left and righ side are in place.

Both left and righ side are in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.