KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-9-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator/Vertical stab/pitot/install

Installed the elevators. The counterbalances are alittle light so I'm going to add some washers under the counterweight hold-down fastener. Everything attached and torqued at this point
-Installed the vertical stab. Torqued
-Started on rudder and realized I didn't get the position light wire inside the rudder extended to meet the pigtail from the fuselage. Didn't have my wire at the hangar -- moving pains, so I moved to the pitot.
I have the pitot installed including the wiring. Just need to put in the screws real quick.

Next session I'll knock out some of these loose ends and get the wing control surfaces on - hopefully!
' style=

Elevators and vertical on

Elevators and vertical on

' style=

Pitot plumbing and wiring hooked up and ready to go.

Pitot plumbing and wiring hooked up and ready to go.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.