KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-7-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Wing Root Work +

Safetied the forward tank bracket bolts (L/R).
Secured the wires in the left wing root
Torqued and cotter pinned the after spar bolts
Torqued the fuel and vent lines on both roots and mark with torque seal
Put the vertical stab in position, had to leave before I finished.
' style=

Tank bracket and fluid lines secured

Tank bracket and fluid lines secured

' style=

Left wing wires hooked up and read to go

Left wing wires hooked up and read to go

' style=

Rear spar bolts done

Rear spar bolts done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.