KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-12-2011
Number of Hours:  1.70
Manual Reference:  
Brief Description:  Wing install #5

Did alittle adjustment to the sweep. My dimensions were good, but the plumb bobs should just alittle fwd sweep (3/16") on both wings. Once that was done I checked and re-checked and re-checked all of the critical dimensions.
I then layed out my edge distance lines on the rear spar carry through.

Once that was done and re-checked my marks. I again re-checked the incidence and sweep.

I then pilot-drilled #30 the left wing. I put a cleco in the hole and re-checked everything. I then pilot drilled the right wing and cleco'd. Everything looks good.

Ran out of time so I'll have to open up the hole and final ream to 5/16 next session.
' style=

Have to stay inside the narrow rectangle. The horizontal lines taper following the carrythrough shape

Have to stay inside the narrow rectangle. The horizontal lines taper following the carrythrough shape

' style=

This tool keeps the bit staight as it penetrates the 3 layers of aluminum

This tool keeps the bit staight as it penetrates the 3 layers of aluminum

' style=

Clamped in place

Clamped in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.