KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  3-5-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Rear Throttle install and throttle quadrant final

-Installed and rigged the aft seat throttle.
-Final assembly of the throttle quadrant to include:
Tightening all the jam nuts on the clevis ends
Installing cotterkeys in each clevis pin (4)
Re-installing the quadrant assembly into the fuselage.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.