KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-4-2010
Number of Hours:  6.70
Manual Reference:  
Brief Description:  Empennage fairings

Worked on the emp, horizontal stab (HS), elevator and rudder fairings today. I have the rudder bottom ready to prep for paint as well as the HS, elevator and rudder tips.
-Painted the emp fairing - 3 coats. I'm calling it done.
-Sanded all the other parts to a general smoothness
-Riveted the rudder top on. I installed a metal backing so the rivets wouldn't pull through.
-Installed nutplates on the rudder bottom
-Installed the aft position light in the rudder bottom
-Reinstalled the rudder on the airplane

I'll work on the vertical stabilizer fairing next - the last one on the tail. Since the rudder will be black, I will paint the fairings on the airplane. I'll paint the elev, HS and VS tips silver like the emp fairing.
' style=

Emp fairing done - not the dust from overspray - it will wipe off

Emp fairing done - not the dust from overspray - it will wipe off

' style=

Rudder fairings done and ready for prep for paint and then paint

Rudder fairings done and ready for prep for paint and then paint

' style=

Elevator and horizontal stab fairings are done - just need prep for paint and paint

Elevator and horizontal stab fairings are done - just need prep for paint and paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.