KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-1-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Smoke oil system #3

Got up early and got some good building time in before I had to shift into 'honey do' mode.
-Finished up the locating the filter, pump, and flow valve onto the mounting plate
-Mounted these components and put them into position between the longerons
-Then I hooked up the hoses to the tank and connected it to the filter inlet.
-I trimmed the long line coming from the firewall and attached it to the outlet on the flow valve
-Put the -8AN cap on the extra outlet on the tank
-Fabricated the 3/8" aluminum line for the vent. Drilled a hole in the bottom of the fuselage and put in a rubber gromment. Then I installed the vent line with an -6 AN B nut on top of the tank.
-Reinstalled the battery box, battery and associated wires.
-Ran the pump positive wire from the smoke relay behind the instrument panel back to the pump. Grounded it locally.
' style=

This keeps everything aft so I can take advantage of moving the CG aft since I'm running the Hartzell

This keeps everything aft so I can take advantage of moving the CG aft since I'm running the Hartzell

' style=

Here you can see the vent line.

Here you can see the vent line.

' style=

Batt box installed -all of this will be covered up by the aft baggage shelfs/bulkheads

Batt box installed -all of this will be covered up by the aft baggage shelfs/bulkheads

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.