KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-13-2009
Number of Hours:  1.30
Manual Reference:  8-70
Brief Description:  Fwd Baggage Door #9

-Fabricated a piece of .032 that ties the aft rib to the new stiffner that runs across the baggage door. Drilled attach holes for same.
-Match-drilled the remaining #40 and #30 holes in the baggage door assembly per the plans.
-Enlarged the tooling holes to 5/16 per the plans
-Trimmed the baggage door hinge to length
-Clamped it into position on the baggage door per the plans and match drilled using the door holes
-Uncleco'd all of the baggage door components in preparation for deburring
' style=

Hinge clamped into position

Hinge clamped into position

' style=

Drilled...

Drilled...

' style=

Dissassembled and ready for deburring, etc.

Dissassembled and ready for deburring, etc.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.